Exciting moment as the engine goes in for the 1st time.
It's really a 2 man job with one person directing the end of the transmission whilst the other controls the hoist. Here I left Mike holding the transmission while I took a photo!
and there it is, in place:
The holes on LHS bracket don't quite match up with those on the chassis. This is something I;ve seen been commented in several other build diaries.
The single bolt is located okay on the RHS:
And the transmission is central in the tunnel:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment